01 / The existing floor
Look below the finish.
Its condition and any existing coating help determine the preparation and the system to discuss.

On site with the team / Floor preparation
Industrial / London & Surrey
Standard resin paint coatings, with floor preparation, site access and turnaround needs considered from the start.
Get a quoteA practical starting point
For industrial spaces, the priority may be a straightforward resin coating and an efficient programme. Start with what the floor needs to do, then plan the work around the site.
01 / The existing floor
Its condition and any existing coating help determine the preparation and the system to discuss.
02 / The working space
Tell us about traffic, equipment, cleaning and the areas that need attention. Those details shape the specification.
03 / The available window
Share the shutdown or access window you have in mind. Preparation, application and curing all need to fit the agreed programme.

Standard resin coatings
Standard resin paint coatings are the starting point for the industrial offer. Choose a colour direction and talk through the floor condition, preparation and practical requirements.
A short turnaround matters, but the working window must allow for the chosen system. Timing can be discussed once the floor and access are understood.
Explore solid coloursBefore we talk
Photographs, approximate floor area, current surface condition and access dates give us a useful starting point. Include any known site constraints or areas that must remain in use.
The Surface Palette
Browse the solid-colour references, then confirm the system and final colour for your floor.
View solid colours
Light Grey / RAL 7035
Mid Grey / RAL 7001
Anthracite / RAL 7015
Looking for a different finish?
The next step